Sponsored Links
Results 1 to 9 of 9
  1. #1
    davidMD is offline Member 511 points
    Join Date
    Jan 2009
    Location
    Jersey City, NJ
    Posts
    394
    Downloads
    0
    Uploads
    0
    Thanks
    0
    Thanked 0 Times in 0 Posts

    How's the construction of the new campus?

    Advertisements



    Sooooo...what's going on down there....
    I heard there was 3 phases to the project...where is AUA at ?
    Courant Institute of Mathematics
    Saba University School of Medicine
    Pray for me....

  2. #2
    isalador is offline Junior Member 510 points
    Join Date
    Oct 2007
    Location
    Antigua
    Posts
    45
    Downloads
    0
    Uploads
    0
    Thanks
    0
    Thanked 0 Times in 0 Posts
    The head planner/builder man told me they plan to hold classes in the new buildings by aug.'09. And for once I believe them, the construction is going quicly and they don't mind cramming us into places that are not quite ready (ask anyone from a 2 years ago about the pre-med building...I was literally over joyed about a new TOILET)

    Right now the classes on new campus or 'north campus' per new lingo are held in modular type buildings. They are a huge improvement. The air-con pumps and there are enough plugs without bringing your own extension cord (but youstill might need one for Med 1). The bathrooms are palacial and are never out of paper. Wow, I have been here to long. I just listed toilet paper and a toilet as huge perks.

  3. #3
    md12886 is offline Member 510 points
    Join Date
    Apr 2008
    Posts
    337
    Downloads
    2
    Uploads
    0
    Thanks
    0
    Thanked 0 Times in 0 Posts
    as promised earlier, here u go
    Attached Thumbnails Attached Thumbnails How's the construction of the new campus?-dsc01849.jpg   How's the construction of the new campus?-dsc01837.jpg   How's the construction of the new campus?-dsc01839.jpg   How's the construction of the new campus?-dsc01840.jpg   How's the construction of the new campus?-dsc01851.jpg  


  4. #4
    md12886 is offline Member 510 points
    Join Date
    Apr 2008
    Posts
    337
    Downloads
    2
    Uploads
    0
    Thanks
    0
    Thanked 0 Times in 0 Posts
    some more pics
    Attached Thumbnails Attached Thumbnails How's the construction of the new campus?-dsc01846.jpg   How's the construction of the new campus?-dsc01847.jpg   How's the construction of the new campus?-dsc01848.jpg  

  5. #5
    rahulb is offline Senior Member 695 points
    Join Date
    Aug 2007
    Location
    bmizzle
    Posts
    806
    Downloads
    14
    Uploads
    0
    Thanks
    0
    Thanked 0 Times in 0 Posts
    lol looked exactly the same in jan 08. we were the 1st class on that campus (med 2)
    [X] Attending Physician

  6. #6
    md12886 is offline Member 510 points
    Join Date
    Apr 2008
    Posts
    337
    Downloads
    2
    Uploads
    0
    Thanks
    0
    Thanked 0 Times in 0 Posts
    thats an insult against hard working employees on the world lol....

  7. #7
    Compassion MD's Avatar
    Compassion MD is offline Permanently Banned 517 points
    Join Date
    Nov 2005
    Posts
    1,424
    Downloads
    12
    Uploads
    0
    Blog Entries
    2
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Very Impressive.... Makes me wonder where AUA is going to go in 2010....

  8. #8
    Drdiego's Avatar
    Drdiego is offline Member 512 points
    Join Date
    Jul 2007
    Posts
    246
    Downloads
    0
    Uploads
    0
    Thanks
    0
    Thanked 0 Times in 0 Posts

    abandoned game

    I hope these are not the same workers who prepared the Sir Vivian Richards stadium for the Cricket Match yesterday that had to be abandoned due to concerns of health risk for the players. This was atrocious to say the least.

  9. #9
    Tipton's Avatar
    Tipton is offline Ultimate Member 6138 points
    Join Date
    Sep 2006
    Posts
    5,197
    Downloads
    0
    Uploads
    0
    Images
    1
    Thanks
    0
    Thanked 0 Times in 0 Posts
    Quote Originally Posted by Drdiego View Post
    I hope these are not the same workers who prepared the Sir Vivian Richards stadium for the Cricket Match yesterday that had to be abandoned due to concerns of health risk for the players. This was atrocious to say the least.
    THAT's a legitimate concern. I know I would hire turf-prep workers to build something.

Similar Threads

  1. Construction
    By Allthaticanbe in forum Windsor University School of Medicine
    Replies: 2
    Last Post: 08-12-2009, 11:18 PM
  2. IAU campus construction/"Destiny U."
    By superpatient in forum International American University (IAU)
    Replies: 0
    Last Post: 05-21-2008, 04:06 PM
  3. Since AUA is building this new campus, where are the construction pictures?
    By n3rd in forum American University of Antigua (AUA)
    Replies: 20
    Last Post: 02-15-2007, 09:24 PM
  4. AUA New Construction
    By nomz in forum American University of Antigua (AUA)
    Replies: 3
    Last Post: 07-21-2006, 12:34 AM
  5. any new construction at sgu
    By familydoc2b in forum St. Georges University School of Medicine
    Replies: 13
    Last Post: 02-24-2004, 10:34 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •